Phase 1 consists of: • 4 Sound Stages, creating 7000sqm of studio filming space.
• Workshops 5600sqm (Industrial Buildings)
• Back-lot for out-door set-building
• Production Office space 1500sqm
• Management offices
• Support buildings for studio service companies
• Commercial retail space
• Roads, water, electricity, sewerage systems
• Residential
General Specifications:
• The stages have been designed to carefully selected specifications
– Stage 1 would be 2100sqm in size
– Stage 2 1850sqm
– Stage 3 1200sqm
– Stage 4 1850sqm
• Studio Height: 20 metres to the roof
• Lighting gantries
– 12Â & 15 meters
– 1,2 meters Walkways
– hanging capacity of 150kg per sqm
– Point load at any given point of 1,8 tonnes.
• Electricity supply distribution boards
– 3 or more
– 400amps per board
– 1200 amps of electricity
– Two 630KVA generators for back-up power
– Capacity for mobile, air-conditioning units to be connected
– Mobile Generator Hook-up
– Dimmer rooms
• Sound Integrity
– Sound Doors
– 150mm concrete walls, internal walls with sound blankets